Insulation is the inspection that holds up board. We fill every cavity tight — no gaps, voids or compressed batts — seal penetrations and hand the wall over ready to sign off, so drywall can start on schedule.
Any insulation scope on a unit or building schedule:
| Step | Owner | Note |
|---|---|---|
| Rough-in check | Pacific | Walk MEP, flag gaps |
| Install & seal | Pacific | Tight fit, no voids |
| Insulation inspection | Coordinated | With GC & inspector |
| Release to drywall | Pacific | Board starts on time |
Exact spec confirmed at takeoff — ask for unit pricing.
Product and thickness matched to the energy code and drawing detail.
STC batts between units and corridors for quieter, compliant buildings.
Mineral wool and firestop at rated walls, built to the UL detail.
Cavities filled and sealed so sign-off never holds up drywall.
Thermal and sound insulation across units, corridors and top floors.
Send plans today and get a trade-by-trade bid with a fast turnaround — unit-priced, easy to level.